WOODCHUCK HILL ROAD BRIDGE REPAIR
Remove and dispose of damaged bridge abutments and wingwalls, and replace with retaining wall and rip-rap in accordance with the Contract Documents
Status
Bidding Closed
Bid Date | 9/21/23 2:00pm |
Company & Contacts
Plumley Engineering, PC
Jesse D. Plumley, P.E.
(315) 638-8587 / jesseplulmey@plumleyeng.com
Location
Woodchuck Hill Road Bridge crossing White Creek in the Town of Newport
A non-refundable fee made payable to Avalon is required for this project.
Hard copy only, no electronic download available.